rf-generator matching has to be done manually otherwise the matching is very unstable
the backup generator and matchbox should be tested at IDA3
the generator and matchbox currently used at IDA3 should be tested with a different sputter gun
Messtechnik
PTC:
the PTC again reaches its old basetemperatures of less than 4K
the issue was mostlikely due to contaminated Helium inside the PTC due to a leak in the pressure controller during refilling or the rotation valve frequency was incorrectly set.
the controller of the rotationary valve will be marked to be always set to "30.0"
New JJ-Dipstick:
dipstick is now operational and reaches temperatures below 3.8K
12 channels for JJ measurements + 12 channels for other dc measurements
multiple people can measure during one cooldown
everyone should enter in the PTC calendar which channels they intend to use and which channels are still free
SQUID measurements at PTC:
noise is reduced significantly when unplugging the thermometer from the dipstick "PTC-SQUID"
test whether noise is already removed when lakeshore bridge is turned off and how unplugging the thermometer inside the PTC affects the noise
does the noise improve when using the new advanced/highperformance lakeshore bridge?
Bluefors:
next time the Bluefors cryostat is opened up Sebastian wants to take a look at it
the remaining copper parts of the dc-wiring will be installed on the MXC stage for the next run
Other topics
clean up till the lab tour on 12.06.24 :
all labs must be tidied up for the lab tour
everyone should actively look for trash in the labs and offices
measurement data, laboratory journals, delivery notes, signed theses, etc. must be kept.
ask if you are unsure whether something can be thrown away